Fairlington Commons Newsletter

3367 S. Wakefield Street, Arlington, VA  22206                           March 2009


 

Co-Owners Hold Line on Budget

 

T

he Fairlington Commons Council of Co-Owners has voted against an increase in fees to fund the use of natural slate for roof replacement in 2009, a decision which means synthetic slate will be used instead.

 

Co-Owners representing 101 of the Commons’ 229 units, or 44.8% of the voting interest, cast votes at a special meeting on Tuesday, March 10th or submitted their vote by proxy. The level of participation exceeded the 33.3% needed for a quorum.  A total of 78.7% of participating Co-Owners voted against raising fees and 21.5% voted to raise them.  There was one abstention. Approximately 43 people attended the meeting.   

 

Had the increase been approved, condo fees would have gone up 4.3% averaged over the year.  However, since the increase would not have taken effect until May 1, it would have been collected over eight months instead of 12.  This meant that from May 1 until the end of the year, the increase would have been 6.5%. 

 

In the days before the meeting, the Board distributed a detailed letter to all Co-Owners that summarized the pros and cons of the two materials.  During the hour-and-a-half long meeting, views were presented on both sides of the issue.  The Co-Owners’ vote will guide Board decision-making on natural vs. synthetic slate in the future.  

 

The Board expresses its thanks to Co-Owner Nick Lowry for reviewing the meeting notice and helping distribute it.

 

Painting Plans

 

T

he Board is competitively bidding our painting contract for 2009-2011. Five contractors, including incumbent Shamrock Painting, have been invited to take part.  A walk-through was held March 4th so the bidders could see what needs to be done in 2009 and familiarize themselves with the community. 

 

Bids are due March 20th.  The Board will select a contractor thereafter based on the lowest responsible bid, after verifying that reference checks and insurance coverage meet our requirements.  Hopefully, painting will begin next month or in early May.

 

Once painting begins, the contractor will alert Co-Owners of units to be painted several days in advance.  You will be asked to pull up storm windows to allow access to the space between the windows.  In addition, in order to paint the full surface of doors, painters will need to be able to open them. If the door is locked and no one responds to the painter’s knock, the door will be painted in place.

 

Doors in their natural color are the responsibility of the Co-Owner and will be ignored by the painters unless the Co-Owner informs Service Coordinator Eric Pamer that they want it painted. 

 

 

Co-Owners are reminded that the Board has previously decided back doors will be painted on a six-year cycle instead of every three years. This means that back doors of approximately half the units scheduled for painting this year will be painted.

 

A list of all units to be painted over the three-year period will be posted on the Commons’ website after April 1.  Below is this year’s schedule.  Units with bolded addresses below will have their back doors painted this year:

 

34th Street

Wakefield Street

4415 - 4425

3315 - 3319

4437 - 4447

3325 - 3327

4501 - 4527

3345 - 3349

4689 - 4697

3369 - 3373

 

3332 - 3358

 

 

Enforcement Matters

 

T

he Board has been forced to take a number of enforcement actions this year to assure compliance with our By-Laws.  Attention focused on non-conforming satellite dishes, vehicle hangtag violations, delays in removing construction trash, late payment of condominium fees, and storage of items in the General Common Element.

 

In addition, in one parking lot, a different type of parking problem emerged.  A resident’s vehicle straddled the line between two parking spaces, creating a ripple effect down the line as others parked their cars.  Our towing policy also applies to such violations.


 

Fence Replacement

 

O

ur contractor, Patrick McCloskey, will soon begin replacing the patio fences of 3321 A&B and 3323 A&B S. Wakefield.  The fences at 3359-3361 S. Wakefield are also scheduled for replacement this year.

 

 

Turf’s Up

 

T

o prevent soil erosion along the steep hillside along the street above the upper Utah parking lot and to beautify the area, Somerset Landscaping will soon be planting pachysandra, maiden grass, forsythia, and liriope.  The work, an add-on to our contract with Somerset, will be done for $6,396.00.

 

Call for Volunteers

 

W

ant to help improve the Commons community and perform a civic service at the same time?  Volunteer!  The Grounds Committee could use your help, and parking monitors are needed in lots around the Circle and those situated off S. Utah Street.  Contact any Board member for further information.

 

 

 

Fairlington Commons Board of Directors

President

John Sinks

E-mail jsinks@comcast.net

931-2660

Vice President

Christine Sivigny

E-mail CSivigny@hotmail.com

 

Secretary

Bernie Weaver

E-mail WeaverBW@comcast.net

671-7024

Treasurer

Arvy Myers

e-mail: Arvy.Myers@gmail.com

 

At Large

Jim Sharpe

e-mail: grosharp@msn.com